U.S. 401/Louisburg bridge open again after June 8 flooding
The bridge on U.S. 401 and Louisburg Road, which was knocked out due to flooding back in June, is now open again.
Posted — UpdatedThe bridge on US 401 and Louisburg Road, which was knocked out due to flooding back in June, is now open again.
Officials with the NC Department of Transportation said the bridge, which goes over the Little River, opened six weeks ahead of schedule. It was closed six weeks ago after heavy rains inundated the northeast Raleigh area.
According to the NCDOT, original estimates following the flood event that wiped out this and other structures in the area pegged the reopening for Aug. 31. NCDOT engineers worked with a contractor that was already onsite and under contract to replace the bridge and fast-track the project.
For real-time travel information, visit DriveNC.gov or follow NCDOT on social media
Related Topics
• Credits
Copyright 2024 by Capitol Broadcasting Company. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.