Triangle Town Center playground opening postponed
The new opening, originally set for Aug. 16, is now scheduled for Sept. 6. There's apparently been a delay in getting materials for the construction.
Posted — UpdatedThe opening of the new indoor playground at Triangle Town Center in Raleigh has been postponed a few weeks.
The new opening, originally set for Aug. 16, is now scheduled for Sept. 6. There's apparently been a delay in getting materials for the construction.
The playground closed July 31 for a big upgrade. The play area's theme will be based on North Carolina's geography from the beaches to the mountains. A rendering shows everything from a beaver and dolphin to climb on to a pretend beach area and a pretend waterfall to a car and boat.
Everything will be new from the carpet to the equipment. It will be in the same location as the original playground.
Related Topics
• Credits
Copyright 2023 by Capitol Broadcasting Company. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.